Laserfiche WebLink
PION FM ma'111IFN <br /> Lic. # 898247 <br /> Kaiser Foundation Hospital <br /> 7373 West Lane <br /> Stockton, Ca. 95210 <br /> Phone: 209-476-5000 <br /> Fax: 209-476-3413 <br /> Attn: Ed Rocha Chief Engineer <br /> Subject: Kaiser Permanente Hospital <br /> Work Scope: Change out bucket (fill bucket) emergency generator tank. <br /> • Saw cut around fill bucket. <br /> • Jack hammer out the saw cut area around the bucket. <br /> • Remove the concrete from around the bucket. <br /> • Remove pea gravel from around existing bucket. <br /> • Remove the existing equipment from the existing bucket. <br /> • Remove the existing fill bucket from the existing tank riser. <br /> • Install new SFAonto existing tank riser. <br /> • Install new OPW 2100 series bucket onto new SFA400 riser adopter. <br /> • Install new OPW drop tube into the new 2100 fill bucket. <br /> • Install new fill port into the new fill bucket. <br /> • Install new fill cap into new fill bucket. <br /> • Call for inspection on the newly installed system. <br /> • Backfill around new fill bucket with pea gravel. <br /> • Set up and pour concrete back around new fill bucket. <br /> • Site cleanup. <br /> Included: labor, materials (concrete, rear, hard piping) Equipment (jackhammer, compressor, <br /> saw cutter etc).Travel, Trucks. Disposal from demo. Permit (air quality and environmental <br /> paper work). Equipment to be installed Cost for permits. 3rd party testing. <br /> Excluded: Any unforeseen things that the agencies want to be done to complete the project. <br /> Anything not listed in the above work scope. Please feel free to contact me with any questions. <br /> 916-320-0908. <br /> Gary Felton, P.M. <br /> Project Manager <br /> p916-320-0908 l Paso Road, Suite - f916-543-7048 <br /> , <br />