My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
2300 - Underground Storage Tank Program
>
PR0232494
>
COMPLIANCE INFO_2009-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 12:52:58 PM
Creation date
6/3/2020 9:57:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2013
RECORD_ID
PR0232494
PE
2361
FACILITY_ID
FA0002602
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232494_7373 WEST_2009-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PION FM ma'111IFN <br /> Lic. # 898247 <br /> Kaiser Foundation Hospital <br /> 7373 West Lane <br /> Stockton, Ca. 95210 <br /> Phone: 209-476-5000 <br /> Fax: 209-476-3413 <br /> Attn: Ed Rocha Chief Engineer <br /> Subject: Kaiser Permanente Hospital <br /> Work Scope: Change out bucket (fill bucket) emergency generator tank. <br /> • Saw cut around fill bucket. <br /> • Jack hammer out the saw cut area around the bucket. <br /> • Remove the concrete from around the bucket. <br /> • Remove pea gravel from around existing bucket. <br /> • Remove the existing equipment from the existing bucket. <br /> • Remove the existing fill bucket from the existing tank riser. <br /> • Install new SFAonto existing tank riser. <br /> • Install new OPW 2100 series bucket onto new SFA400 riser adopter. <br /> • Install new OPW drop tube into the new 2100 fill bucket. <br /> • Install new fill port into the new fill bucket. <br /> • Install new fill cap into new fill bucket. <br /> • Call for inspection on the newly installed system. <br /> • Backfill around new fill bucket with pea gravel. <br /> • Set up and pour concrete back around new fill bucket. <br /> • Site cleanup. <br /> Included: labor, materials (concrete, rear, hard piping) Equipment (jackhammer, compressor, <br /> saw cutter etc).Travel, Trucks. Disposal from demo. Permit (air quality and environmental <br /> paper work). Equipment to be installed Cost for permits. 3rd party testing. <br /> Excluded: Any unforeseen things that the agencies want to be done to complete the project. <br /> Anything not listed in the above work scope. Please feel free to contact me with any questions. <br /> 916-320-0908. <br /> Gary Felton, P.M. <br /> Project Manager <br /> p916-320-0908 l Paso Road, Suite - f916-543-7048 <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.