Laserfiche WebLink
COMPANY: GF Engineering DATE OF QUOTATION QUOTE NUMBER <br /> PROJECT Kaiser Stockton 02/03/09 wdf2309 <br /> QUANTITY DESCRIPTION S UNIT PRICE EXTENDED <br /> 1 OPW 1 C-2100C-DEUR 5 Gal Fill w/Drain Cast Iron Cover $ $ <br /> 1 OPW 71SO-410C EVR 4"Overfill Valve 2 Point 120"Upper 102"Lower $ $ <br /> 1 OPW 71 SO-TOOL Installation Tool For 71 SO $ $ <br /> 1 OPW 634TT-7085-EVR 4"Fill Cap $ $ <br /> 1 OPW 61 SALP-1020-EVR Fuel Swivel Adapter Low Profile,Bronze $ $ <br /> 1 OPW FPN4x5 4"Nipple 5.5"Long $ $ <br /> Exclusions: <br /> Fuel Surcharges-Many factories are now adding on fuel surcharges to cover the <br /> high cost of fuel.Currently Gilbarco and Gasboy have implemented fuel <br /> surcharges. NWP expects many other factories to follow.NWP wOf have to pass <br /> these charges on.Please be aware that your final bill will include any fuel <br /> surcharges that NWP has to pay. <br /> Above Specifications Exclude the Following(Unless Otherwise Noted): <br /> Plans,Permits,Inspection,All Testing,Labor to Assemble or Install,Miscellaneous <br /> Pipe Fittings and Accessories,Any Electrical Consideration,Offloading or Setting Any <br /> Equipment or Tank, Site Improvements, Guard Barriers, Any Other Items(s)Not <br /> Specifically Mentioned Above <br /> Equipment Only: No Installation.Subject to engineer's approval. This quotation does <br /> not include or imply any equipment or quantities other than fisted herein. Contractor to <br /> determine actual quantities required. No retainage to apply. <br /> Performance: Performance of equipment listed is based upon the accuracy of the <br /> information supplied to NW Pump and Equipment Co.by the customer or customer's <br /> engineer.Guarantee of performance may require approval by a licensed engineer at <br /> the customer's expense.NWP is rot responsible for any warranty outside of standard <br /> manufacturer warranties. <br /> Page 2 of 2 <br /> Northwest Pump Equipment Co. <br />