Laserfiche WebLink
0 <br /> padre <br /> sociates, Inc. <br /> 153 ENGINEERS, GEOLOGISTS & ENVIRONMENTAL SCIENTISTS <br /> May 2, 2013 <br /> Project No. 1301-0621 <br /> Petro-Analytical, Inc. <br /> Post Office Box 2301 <br /> Orinda, California 94563 <br /> Attention: Mr. K.W. `Bud' McCuaig <br /> President <br /> Subject: Technical Work Plan/Site Health and Safety Plan, Soil Assessment Activities <br /> Related to the Removal of Fuel Oil Piping at the Kaiser Permanente Facility,7373 <br /> West Lane, Stockton, San Joaquin County, California. <br /> Dear Mr. McCuaig: <br /> Padre Associates, Inc. (Padre) is pleased to present the attached Technical Work <br /> Plan/Site Health and Safety Plan (TWP/HSP) to complete soil assessment activities in support <br /> of the removal of fuel oil piping at the Kaiser Permanente facility, 7373 West Lane, Stockton, <br /> San Joaquin County, California (Project Site). Padre understands that the piping is situated <br /> underground within 4-inch diameter secondary piping, is approximately 130 feet long, and is <br /> used to supply fuel oil to an existing emergency power generator. <br /> Padre appreciates the opportunity to provide environmental services to Petro-Analytical, <br /> Inc. If you have any questions or require additional information, please contact us. <br /> Sincerely, <br /> PADRE ASSOCIATES, INC. <br /> Alan Churchill <br /> Project Geologist <br /> aa-, K.6�' � <br /> Jerome K. Summerlin, C.E.G., C.Hg. <br /> Principal Geologist <br /> 3020 Explorer Drive, Suite 5 ■ Sacramento, California 95827 ■ 916-857-1601 ■ Fax 916-857-1602 <br />