Laserfiche WebLink
May 2013 re <br /> Project No. 1301-0621 safio° ": <br /> ewm+oroxexcn. <br /> 4.0 SCHEDULE <br /> The proposed scope of services will require approximately four to six weeks to complete. <br /> Permit acquisition will require one to two weeks. The field assessment activities will require one <br /> week, and chemical analyses of the soil samples collected will be available within one week. <br /> The report will be prepared within two weeks of completing the fieldwork and receiving the <br /> results of the laboratory analyses. <br /> 13.0621 Kaiser Stockton 7WP-HSP revised <br /> —4— <br />