Laserfiche WebLink
April 2013 <br /> Project No. 1301-0621 associates, o. <br /> ° <br /> ewvuioreuercral.eciErrnata <br /> Personnel working on the project must be made aware of the chemical hazards and the <br /> ramifications to human health from exposure to chemical hazards associated with this project. Prior <br /> to drilling through and handling contaminated soil, workers will be informed of the chemical hazards <br /> and the impacts to human health from exposure to these chemicals via tailgate safety meetings. <br /> Training topics covered should include hazard recognition, flammability and toxicity of chemicals <br /> anticipated to be onsite, use of site monitoring instruments, use of respiratory equipment and other <br /> PPE, etc. <br /> COMMUNICATIONS <br /> Communication in the work zone, including into or out of the exclusion zone, will <br /> generally be accomplished by voice and signaling system. A cellular telephone also will be <br /> available on site for purposes of communicating emergency situations. Cellular phones will not <br /> be used within the hot zone due to potential ignition of vapors. <br /> INSTRUMENT CALIBRATION <br /> Padre will calibrate air monitoring instruments per manufacturer's specifications and in <br /> accordance with procedures described in the operational manuals provided with the monitoring <br /> instruments. <br /> 13.0621 Kaiser Stockton TWP-HSP revised <br /> -A7- <br />