Laserfiche WebLink
STEP 6 Apply FastFuse glue on the insert and in the mouth of the repair <br /> boot where they make contact and push the insert into the boot. <br /> There is no need for any cure time as previously required for the <br /> split boot bonding process. Keep moving forward with the <br /> process. <br /> STEP 7 Push the insert into the mouth of the repair boot With FastFuse <br /> applied to the insert,and the band clamps tightened,there is no <br /> need for an additional 4o minute cure time as previously required <br /> for the split boot bonding process. <br /> STEP <br /> Install both band clamps and tighten to 65 inch lbs.When <br /> completed,you may immediately start any line leak and hydrostatic <br /> leak testing to confirm a successful repair. <br /> n <br /> �J <br /> .. <br /> EC'EIVED <br /> NAR 2 7 2018 <br /> ENVIRONMENTAL <br /> DEPARTMENT <br />