My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
2300 - Underground Storage Tank Program
>
PR0232494
>
COMPLIANCE INFO_2014-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 1:27:31 PM
Creation date
6/3/2020 9:57:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2018
RECORD_ID
PR0232494
PE
2361
FACILITY_ID
FA0002602
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232494_7373 WEST_2014-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Icon • • Fittings <br /> I S R*.*x*. Split Repair Fitting Part Numbers <br /> secondary <br /> STEP i Remove the existing fitting if applicable. Clean primary <br /> the surfice of the secondary and primary pipe with <br /> acetone or isopropyl alcohol where the Y. <br /> replacement reducer/test reducer fitting will be <br /> seated on the pipe. <br /> C. <br /> STEP z Wrap the split reducer/test reducer fitting around <br /> the primary pipe. Clean the split surfices with <br /> acetone or isopropyl alcohol. Apply FastFuse glue <br /> to the split fitting and hold the split fitting together <br /> for at least two(2)minutes. Then leave it alone for <br /> another 40 minutes of cure time. ' <br /> Once totally cured you can push the fitting on=e <br /> secondary pipe sufficiently so that the air testvah a is <br /> positioned over the interstitial opening between <br /> secondary and primaaypipe,if applicable. Rotate <br /> the air test valve to the i2.00 position as applicable. <br /> If no air test valve is needed,then simply make sure <br /> that the fitting sits over the secondary pipe <br /> sufficiently for a band clamp to secure and seal it <br /> completely. <br /> STEP 3 Completely tighten the two band clamps on both the <br /> primary and secondary pipe ends of the fitting. Be With optional drain valve <br /> careful not to overtighten and cut into the boot <br /> material with the clamps. <br /> You are ready to test. Standard 5 PSI is �p <br /> EC recommendedr?R "EIVED <br /> (} <br /> If applicable,when completed with the test,loosen i <br /> MAR 2 7 2018 the band clamps and slide the fitting off of the ,� <br /> secondary to allow for an open drain into the sump. If f <br /> there isn't room for removal,you can order your <br /> ENVIRO3N�'sE6`�9�AL fitting with both an air test valve and drain valve so <br /> DEPARTMENT that it can be left in place after testing. Simply open <br /> the drain valve. , <br /> without valves <br />
The URL can be used to link to this page
Your browser does not support the video tag.