My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
2300 - Underground Storage Tank Program
>
PR0232494
>
COMPLIANCE INFO_2014-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 1:27:31 PM
Creation date
6/3/2020 9:57:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2018
RECORD_ID
PR0232494
PE
2361
FACILITY_ID
FA0002602
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232494_7373 WEST_2014-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Icon Repair Instruction for'ICl and Similar Design Fittings <br /> "IRF'I'Cl*.*A" Split Repair Nv/Air'fest Valve Part Numbers <br /> STEP 6 Apply FastFuse glue on the insert and in the mouth of the repair <br /> boot where they make contact and push the insert into the boot. <br /> There is no need for any cure time as previously required for the <br /> split boot bonding process. Keep moving forward with the <br /> process. <br /> STEP y Push the insert into the mouth of the repair boot. With FastFuse <br /> applied to the insert,and the band clamps tightened,there is no <br /> need for an additional 40 minute cure time as previously required <br /> for the split boot bonding process. n <br /> STEP 8 Install both band clamps and tighten to 65 inch lbs.When <br /> completed,you may immediately start any line leak and hydrostatic <br /> leak testing to confirm a successful repair. <br /> too <br /> v <br /> iL%J <br /> EIV <br /> BAR 2 7 2018 <br /> ENVIRONMENTAL <br /> ;;.DEPARTMENT <br /> •.7867 855.379.7867 info@icontainmert.coni • <br />
The URL can be used to link to this page
Your browser does not support the video tag.