Laserfiche WebLink
Icon Repair Instruction for'ICl and Similar Design Fittings <br /> "IRF'I'Cl*.*A" Split Repair Nv/Air'fest Valve Part Numbers <br /> STEP 6 Apply FastFuse glue on the insert and in the mouth of the repair <br /> boot where they make contact and push the insert into the boot. <br /> There is no need for any cure time as previously required for the <br /> split boot bonding process. Keep moving forward with the <br /> process. <br /> STEP y Push the insert into the mouth of the repair boot. With FastFuse <br /> applied to the insert,and the band clamps tightened,there is no <br /> need for an additional 40 minute cure time as previously required <br /> for the split boot bonding process. n <br /> STEP 8 Install both band clamps and tighten to 65 inch lbs.When <br /> completed,you may immediately start any line leak and hydrostatic <br /> leak testing to confirm a successful repair. <br /> too <br /> v <br /> iL%J <br /> EIV <br /> BAR 2 7 2018 <br /> ENVIRONMENTAL <br /> ;;.DEPARTMENT <br /> •.7867 855.379.7867 info@icontainmert.coni • <br />