My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
2300 - Underground Storage Tank Program
>
PR0232494
>
COMPLIANCE INFO_2014-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 1:27:31 PM
Creation date
6/3/2020 9:57:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2018
RECORD_ID
PR0232494
PE
2361
FACILITY_ID
FA0002602
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232494_7373 WEST_2014-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Icon Repair Instruction forTC1 and Similar D- • <br /> *IRIFTCI*.*F" Non-Split -. Repair <br /> STEP Apply a bead of gasket sealant around the threads of the fitting <br /> cuff,and thread or"pop"the repair boot onto the threaded cuff. <br /> STEP 8 Index or rotate the repair boot so that the vent tube is at the iz:oo --------- <br /> position. <br /> STEP 9 Apply FastFuse glue on the insert and in the mouth of the repair <br /> boot where they make contact and push the insert into the boot. <br /> There is no need for any cure time as previously required for the <br /> split boot bonding process. Keep moving forward with the <br /> process. <br /> "Mat <br /> STEP io Install the band clamps and tighten securely. Fill the entire boot <br /> cavity through one of the tubes with a filler material,like FastFill, <br /> until the material begins to come out of the vent tube. Allow for <br /> some gravity and settling to occur and then add any additional filler <br /> as necessary. <br /> STEP n Clean up any excess sealant in preparation for any testing that may <br /> follow.When completed,you may immediately start any <br /> hydrostatic testing to confirm a successful repair. The fill and <br /> sealant may not yet be completely cured,but there is sufficient cure <br /> at this point that testing is feasible. There is no requirement to <br /> wait any longer if done properly. The quickly gelled nature of the <br /> sealants and fillers allows for testing immediately afterwards. <br /> OFF <br /> 1\7'� <br /> • • • • • • <br />
The URL can be used to link to this page
Your browser does not support the video tag.