Laserfiche WebLink
Results <br /> f Tesdinoervidug <br /> R D. {Q <br /> Software Version Installed: <br /> Cf® cbecklisb <br /> Yes0 No* IS On audible alarm operational? <br /> tA Y O* ? <br /> Yes o* <br /> Yes E3 No* Wen all sensors installedof secondary containment and positioned so that other equipmentwill <br /> not interfere with thek proper ? <br /> 13 Yes E3 No* If alarm we relayed to a rernote monitoring station, is all communications equipment (eg. ) <br /> N/A ? <br /> 13 Yes E3 No* For pressurized piping ty shut down if the pip' t <br /> 1.3 NIA Monitoring system detects a kmak fi&to operstej or is e ? If ym.which sensors initiate <br /> positive ? n t <br /> Did XM confam M!j!bT shut-down due to hWm Ed senmw MumlMsconnection? E3 YM El No. <br /> Yes. 13 No* For {i.e. no <br /> fit NIA mechimical overfill provention valve is `installeA is the overfill le and audible at the tank <br /> fill pm s % <br /> Yes* o or odw equipment replaced <br /> .2Ld for all replacement vuls in Section E, s <br /> Yes* q&No ? (Check all dw apply) <br /> I Product; E3 Water Nyes,describe causes m Section E,below <br /> Yes Ata* ? if Ie <br /> No* I Is an monitoring equhmmmt manufacturees <br /> *In Section E below,dewxlbe how aml when then deficiencles wem or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 1 <br />