My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_1991-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 11:37:26 AM
Creation date
6/3/2020 9:57:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2008
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_1991-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. - /SHt Equipment: U Check this box if tank VA40ng is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is irmffled. <br /> This section must be completedif in-tank gauging equipment is used to paform leak detection monitoring. <br /> Complete the g checklist: <br /> IM Yes U No* Has all input wiring been inspected for proper entry and termination,including . for ground fitults? <br /> IM Yes Q No* Were all tank gauging probes visually inspected for damage and residuebuildup? <br /> Yes 13 No* Was accuracy of system level readings tested? <br /> ❑ Yes 0 No* Was accuracy of system water level readings tested? <br /> IM Yes L3 No* Were all probes reinstalled properly?. <br /> 191 Yes ❑ No* Were all items on the equipment er's maintenance checklist completed? <br /> xIn the Section H,below,describe how and when these deficiencies were or will be co <br /> G. Line_ a ): ❑ Check this box if LIDs are not installed. <br /> COM of <br /> Yes El No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> N/A (Check aU dw zWly) Simulated leak rate: 0 3 .p.h.; ❑0.1 g.p.h; Q 0.2 g.p.h. <br /> Yes No* Were all LLDs confirmed operational a within regulatoryrequirements? <br /> IM Yes ❑ No* Was the testmg apparatus pro ed? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a <br /> Ll N/A <br /> Yes U No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> IM /A <br /> Yes ❑ o* For electronic LIDs,does the turbine automaticallyt off if any portion of the monitoring system is di led or <br /> IM N/A ed? <br /> ❑ Yes U No* For electronic LIDs, does the turbine automatically shut off if any portion of the monitoring system ctions <br /> N/A or Nis a test? <br /> El Yes U No* For electronic LLDs,have all accessible wmng connections been vi ? <br /> IM N/A <br /> IM Yes U No* Were all hems as s maintenance checklist completed? <br /> *In the Section M below,describe how and when these deliciencies,were or will be co <br /> H. Comments: <br /> A,djusted premium vaporless leak detector <br /> Page 3o3 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.