My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:00:21 PM
Creation date
6/3/2020 9:57:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Page of <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested X <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer <br />❑ Other (Spec) <br />❑ Industry Standard ❑ Professional Engineer <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Spec) <br />❑ Vacuum E. Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />SEEMEEMENISM <br />Spill Box # Spill Box # Spill Box # Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or <br />Criteria: <br />, <br />Q Fass Fail El ❑Fail' <br />e'❑FaiTestRes <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Spill/Overfill boxes tested annually with Monitoring System Certification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.