My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:00:21 PM
Creation date
6/3/2020 9:57:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />h -in addition to the su rsible pump: problems encountered - Lhout an in -'line check valve, <br />the -metering .portion PETh leak .Oetector-is hammered by hydraulic shock.* This results in <br />? many leaks.going undetecfied. Those Ceak detectors are dust noequiped for the job,"you <br />purchased them for. <br />The 99 LD -20 -00 -is -t sWe y u_ha been kookrr► #or Voll. leak,detectors with.an inte- <br />grated check ualve_and_ptes.�re re save mond a�d�reduce customer frustra- <br />- ---- - - <br />tion at the dispenser. and: redrre°seticezal_s_ <br />T. -e .99 4.0-200-0. <br />-H&A Higher=leve[ Of-Peiform&rie6 Over A,broaader Range of Burial Depth, -Line Length, <br />And Piping System_TygesThan-An"rQtreLeafletector: _... <br />Additional Features . <br />• <br />Over 20% increased flow capacity., .::.- <br />• Guaranteed' for 24 months from ds e.of,installation to detect. 3 GPH @10 PSI leak <br />• One V1/ay Popper <br />• Reverse Ratio Piston I Poppet 6dib nation <br />Shia#ter Volume,-faster�e;:. <br />Shortest profile leak detector-acaitata -e=for="tight". installations <br />• Alt.:fuels_(--gasolin.iL .diesel alcoljot - _ <br />• ill-papelipes.�flexibte.� fa,ber�ta�s steel�,to 4�Q,:mi;,�resiliency <br />f • Exceeds EPA reguiatlons (3 GPH Q.10151),_ <br />•:Detects leaks..up.fio 10' abQVQ,,th�.teak detector--.: <br />-L-_. <br />• Installs with 2 111.6" six point socket:br p'TO&Wtench <br />Increased Flow Ca <br />paoty <br />The 99 LD-200Ghas maximized the flow and -flow path in existing, older submdrsible pump <br />heads: This new'desigf aUdWs over 20% more..1flow than precious LD -2000 models, maximiz- <br />ing -pump per-formance fnr earlier. PUMP-. .. enols;''` <br />-ongest.Guarantee <br />•:e9;DO sfraes the_iongest^guarantee-availabl-Ii-thein dustry atorg wath all other- <br />_ <br />VMI LD -200(3 senes leak=detectors: `For 24 montfas q ra date'df-iristal-lataon, the tD-200D is <br />_ <br />gaaranteed to see a-3�Pi+74 ak4 1.0 -PSI <br />•The One Way PoppetCoyrr. Patioes ;p ur t ffnce Morn rine leak zletection .at pump <br />�st <br />-. <br />ores <br />thermal conditions encountered d <br />msjgnificant down to =20° <br />en-me�era <br />_ nge� <br />
The URL can be used to link to this page
Your browser does not support the video tag.