Laserfiche WebLink
COMPANY: ELITE IV CONTRACTORS <br />DATE OF QUOTATION <br />01/30/10 <br />QUOTE NUMBER <br />204202 <br />PROJECT BILL'S 76 <br />QUANTITY <br />DESCRIPTION UNIT PRICE <br />EXTENDED <br />1 <br />VEEDER ROOT IN-STATION DIAGNOSTICS ISD <br />1 <br />VEEDER-ROOT 330160-004 SEM Software Enhancement Module $ 2,339.00 <br />$ 2,339.00 <br />4 <br />VEEDER-ROOT 330020-585 Balance VST Vapor Flow Sensor - 1 per disp required $ 968.00 <br />$ 3,872.00 <br />1 <br />VEEDER-ROOT 331943-203 NVMEM 2 Report Storage 1 per console required $ 439.00 <br />$ 439.00 <br />1 <br />VEEDER-ROOT 330404-020 Dispenser Interface Module (DIM) $ 787.00 <br />$ 787.00 <br />1 <br />VEEDER-ROOT 848722-025 25' Cable to TLS350 & Install Manual $ 147.00 <br />$ 147.00 <br />1 <br />VEEDER-ROOT 330148-001 RS-232 Interface Module W/Auxilary Port $ 436.00 <br />$ <br />0 <br />"Optional" Square D CC01 BZFLT Cashier Control Center. Required by Carb When the TLS350 $ 470.00 <br />$ - <br />Console Is Not In Close Proximity to The Station Attendant. <br />Fuel Surcharges- Many factories are now adding on fuel surcharges to cover the high cost of fuel. Currently Gilbarco <br />and Gasboy have implemented fuel surcharges. NWP expects many other factories to follow. NWP will have to pass <br />these charges on. Please be aware that your final bill will include any fuel surcharges that NWP has to pay. Sales Tax <br />Subject to Freight Destination. Freight Charges Listed are Estimated-Subject to Change. <br />Above Specifications Exclude the Following (Unless Otherwise Noted): Plans, <br />Permits, Inspection, All Testing, Labor to Assemble or Install, Miscellaneous Pipe Fittings and Accessories, Any Electrical <br />Consideration, Offloading or Setting Any Equipment or Tank, Site Improvements, Guard Barriers, Any Other Items (s) Not <br />Specifically Mentioned Above <br />Equipment Only: No Installation. Subject to engineers approval. This quotation does not include or imply any equipment or <br />quantities other than listed herein. Contractor to determine actual quantities required. No retainage to apply.All Start-UP and <br />Training Services Provided by Manufacturer's Authorized Service Contractors, Not NWP. Any Additional Fees <br />Associated With These Services are the Responsibility of the Buyer, Unless Otherwise Noted <br />Performance: Performance of equipment listed is based upon the accuracy of the information supplied to NW Pump and <br />Equipment Co. by the customer or customers engineer. Guarantee of performance may require approval by a licensed <br />engineer at the customer <br />Page 2 of 2 <br />Northwest Pump Equipment Co. <br />