Laserfiche WebLink
Jul 29 10 01:08p Elite IV Contactors 12094616342 p.4 <br />SAN JOAQUIN COUNTY <br />Q; M ENVIRONMENTAL HEALTH DEPARTMENT <br />` 600 East Main Street, Stockton, CA 95202-3029 <br />Telephone:'(209) 468-3420 Fax: (209) 468-3433 Web: www.sicioyora/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Leak detector <br />Inspection Date: <br />Facility Address: <br />,ter, � R• i ti <br />fie <br />❑ mechanical <br />Service Request #: <br />�.,� ��� <br />OnsiteService Technician's Name: <br />ICC Service Technicianllnstaller Exp. Date: <br />Manufacture1r Training: <br />❑ <br />❑ line test ro rammed <br />.s� z <br />❑ <br />SERVICE <br />Leak detector <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ mechanical <br />Model: <br />❑ Caldwell System ❑ Other <br />❑ electronic <br />Serial #: <br />❑ <br />❑ line test ro rammed <br />Leak detector <br />❑ <br />❑ mechanical <br />Model: <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANYTIME AT EHD'S CU T HOURkY'f2ATE. <br />❑ electronic <br />Serial #: <br />Primary piping testing at: <br />.-. ❑ line test programmed <br />psi <br />Leak detector <br />minutes <br />® <br />❑ mechanical <br />Model: <br />UDC(s) Piping <br />❑ electronic <br />Serial #: <br />❑ <br />❑line test programmed <br />La, sensor <br />G:t,",Ai6y' t n <br />Model: <br />instaitat on, o mori hs after, and every 36 months thereafter. <br />❑ positive shutdown <br />Cold start of monitoring panel <br />❑ <br />❑ fail safe <br />Serial #: <br />Other: see below <br />❑ NA <br />_ sensor <br />❑ positive shutdown <br />u^thhl...dAy" <br />Model: <br />❑ fail safe <br />Serial #: <br />❑ NA <br />P sensor,y' <br />W <br />❑ positive shutdown <br />Model: "a4tIes <br />❑ fail safe <br />Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ [neon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANYTIME AT EHD'S CU T HOURkY'f2ATE. <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />instaitat on, o mori hs after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />EHD 23-04 <br />Rev 11/17/108 <br />UST SERVICE REQUEST INSPECTION REPORT <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANYTIME AT EHD'S CU T HOURkY'f2ATE. <br />EHD lnspector� ry . , /I ..° <br />. <br />Received � i � I <br />.. <br />Title: <br />EHD 23-04 <br />Rev 11/17/108 <br />UST SERVICE REQUEST INSPECTION REPORT <br />