My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:00:21 PM
Creation date
6/3/2020 9:57:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCS, January 2002 <br />Test Method Developed By: <br />Page of <br />5. SECONDARY PIPE TESTING <br />lkfting Manufacturer 0 Industry Standard 0 Professional Engineer <br />Other (Specify) <br />Test Method Used. <br />21tressure 0 Vacuum <br />0 Other (Spec) <br />0 Hydrostatic <br />fI <br />Test Equipment Used: <br />Equipment Resolution: 1110-IS'P 5:' -r - <br />Piping Material: <br />Piping Run# Piping Run # 2, <br />i�,* 6!!3t eess S <br />Piping Run # k'ping Run # <br />Piping Manufacturer: <br />kp mea <br />Piping Diameter: <br />Length of Piping Run: <br />r4p Rev, u-0, AP -2 I -L61 <br />P ox, I W <br />r <br />Product Stored: <br />-f#y, <br />?i�0,15Uw 11 ptus 9 <br />it 1W,A7 <br />Method and location of <br />piping-run isolation: <br />-r--r4 6-:,o4-44- <br />('toe 3L 140d* 3 X-�L- <br />0414ert- <br />z) me, Au. 0Q A 3 <br />Wait time between applying <br />22eSsR>acuurrdwater and <br />startma test: <br />Seo- towww 45 1 it au <br />1 40tAPl- V <br />Test Start Time: <br />3r 8.- <br />Jr., V)*- A <br />Initial Reading (R[): <br />14$X <br />S'ASS / \ <br />Test End Time: . <br />'7 qs" 1., Y <br />1 ttr <br />Final Reading (RF): <br />4p$=- S- <br />st:- () S= <br />Test Duration: <br />rt" -s I t1dy V <br />/ A—.# <br />Change in Reading (RrR,): <br />S.S� )0 S -r- <br />Pass/Fail Threshold or <br />Criteria: <br />I t -,;a <br />Wo S gin" <br />Test Result: <br />0 Pass &lad ass 0 Fail <br />1 400%ss 0 Fail 140 pan 0 Fail <br />Comments — (include infortnation on repairs made prior to testis and recommLn�oUow-mfn�ted tests) <br />gryjSU're- Jae 40 <br />hod- - -4- 4- s-e.,v t a_ �Aoo 4� Ae,,r 4 e-pw, e le, e ;,I <br />L00019000 n xva LT:60 OTWZO/Lo <br />
The URL can be used to link to this page
Your browser does not support the video tag.