My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:00:21 PM
Creation date
6/3/2020 9:57:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 <br /> RECEIVED- <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Prof Q <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ENWRONMENTAL <br /> ❑Other(Spec) I-? A' r+r�, 4 T1Acm-r <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx. 120' Approx. 120' Approx. 120' <br /> Product Stored: Regular 87 Plus 89 Super 91 <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 Piping Sump#3 <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:35 9:25 9:45 <br /> Initial Reading(RI): 3 Psi 3 Psi 3 Psi <br /> Test End Time: 10:35 10:25 10:45 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RI): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.