My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:00:21 PM
Creation date
6/3/2020 9:57:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 i3F.6 <br /> E-WED <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer Cl Industry Standard X Profession r 1J <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hy <br /> ❑Other(Specify) t i7- -fj <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> UDC# 1&2 UDC#3&4 UDC#5&6 UDC#7&8 <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material: Coated Steel Coated Steel Coated Steel Coated Steel <br /> UDC Depth: 13 %2" 13 %2" 13 %" 13 %" <br /> Height from UDC Bottom to Top *See Comments *See Comments *See Comments *See Comments <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to *See Comments *See Comments *See Comments *See Comments <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested Water Level 10" Water Level 10" Water Level 10" Water Level 10" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes Yes Yes Yes <br /> roduct and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail- Yes Yes Yes Yes <br /> safe shutdown?" <br /> Was fail-safe verified to be No No No No <br /> operational?* <br /> Wait time between applying 1 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 10:35 10:40 11:15 11:20 <br /> Initial Reading(RI): .001 .001 .001 .001 <br /> Test End Time: 11:05 11:10 11:45 11:50 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-RI): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30Minutes .005/30 Minutes <br /> Test Result. Pass Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes Yes <br /> Was sensor properly replaced and Yes Yes Yes Yes <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *All Penetrations enter from bottom of Bravo System UDC's. <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to a�of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.