Laserfiche WebLink
0 • Page 9 of 9 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Spill Box#87 vapor Spill Box#89 vapor Spill Box#91 vapor Spill Box# <br /> Bucket Diameter&Brand: 1 12" 12" 12" <br /> Bucket Depth: 14" 14" 14" <br /> Wait time between applying <br /> pressure/vacuum/water and 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> starting test: <br /> Test Start Time: 11:47am 11:47am 11:47am <br /> Initial Reading(Rj): 3.5581 3.4809 4.0793 <br /> Test End Time: 12:02pm 12:02pm 12:02pm <br /> Final Reading(RF): 3.5580 3.4811 4.0794 <br /> Test Duration: 15 minutes 15 minutes 15 minutes <br /> Change in Reading(RF-Rj): 0.00011 0.00022 0.00006 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 0.002 <br /> Criteria: <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />