My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232534_1960 W ELEVENTH_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.In-Tank Gauging/SIR Equipment: r Check this box if tank gauging is used only for inventory controlJ.` <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. 2 i J <br /> Complete the following checklist: ; <br /> 120 Yes r No* las all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ITO YesP No* Nere all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes r No* Nas accuracy of system product level readings tested? <br /> Yes i No* Nas accuracy of system water level readings tested? <br /> Yes No* Pere all probes reinstalled properly? <br /> Yes No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> G Yes ,; No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> N/A apply)Simulated leak rate3 g.p.h.; r 0.1 g.p.h; 0.2 g.p.h. <br /> +y Yes '?• No* Nere all LLDs confirmed operational and accurate within regulatory requirements? <br /> 01 Yes r No* Nas the testing apparatus properly calibrated? <br /> a, Yes r No* or mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> r; N/A <br /> 120 Yes No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> r4� N/A <br /> • Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> r N/A monitoring system is disabled or disconnected? <br /> s Yes No* or electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> N/A onitoring system malfunctions or fails a test? <br /> ITO Yes No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> 170 Yes No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.