Laserfiche WebLink
SWIZCB,January 2002 RECEIVED <br /> 9. SPILUOVERIFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes F' <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested AL <br /> Test Method Developed By: r— Spill Bucket Manufacturer WO', Industry Standard r— ProlnWWRARME IT <br /> Other(Specify): <br /> Test Method Used By: Pressure ry-, vacuum Hydrostatic <br /> Other(Specify): <br /> Test Equipment Used: Equipment Resolution: <br /> ' <br /> Spill Box,,*Tank, <br /> T1,1; TankT2 -Spill <br /> SUP -FM I- PLUS-pili It I,'-Direct- M 1411H,- <br /> Spill Box, <br /> Direct rade tevei"i grade level in 'Dirept-Grad,,,level in <br /> contatrmtient stttnp coritaiturt ,...containtrient.sump <br /> Bucket Diameter: 12.00 12.00 12.00 <br /> Bucket Depth: 12.00 12.00 12.00 <br /> Wait time between applying <br /> pressure/vacuum/water and I min I min I min min <br /> starting test <br /> Test Start Time: 09:30:00 09:32:00 09:35:00 <br /> Initial Reading(RI): -32.00 in.HG -32.00 in.HG -32.00 in.HG <br /> Test End Time: 09:31:00 09:33:00 09:36:00 <br /> Final Reading(RF): -32.00 in.HG -32.00 in.HG -32.00 in.HG <br /> Test Duration: I min I min I min <br /> (RF-Rt): 0.00 in.HG 0.00 in.HG 0.00 in.HG <br /> Pass/Fail Threshold or Criteria: +/-4.00 +/-4.00 +/-4.00 <br /> Test Rauttit` pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2315851 <br />