My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_2015-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2016
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\1960\PR0232534\RETROFIT 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PI�R, 2 <br /> SWRCB,January 2002 Mage of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested El <br /> Test Method Developed By: [I Spill Bucket Manufacturer E]Industry Standard El Professional Engineer <br /> El Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum OHydrostatic <br /> El Other(Specify) inches-1 hr visual test <br /> Test Equipment Used:See attached testing procedures Equipment Resolution: <br /> simmmmmmosomiffam <br /> Spill Box#87 VB Spill Box#91 VB Spill Box# Spill Box# <br /> Bucket Diameter: 12" 12" <br /> Bucket Depth: 14" 14" <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 9:02am 9:02am <br /> Initial Reading(Rj): 13.5 inches-I hr vju hest 13.5 inch,,-I h,,i,u,l Icin —h.s-1 n,viiiiiiii linit inches-,h,visualh <br /> Test End Time: 10:02am 10:02am <br /> Final Reading(RF): 13.5 inches-1 hr visual test 13.5 inches-I h,visual Isin inches.,h,Ville est inches-i hr WsueIL <br /> Test Duration: 1 hr 1 hr <br /> Change in Reading(RF-R,): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Test Result: OPass El Fail Pass OFaill OPass OFail ElPass OFail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.