Laserfiche WebLink
00"'ECEIVEL) <br /> Monitoring System Certification-Page 2 of 3 EB 2 2 2016 <br /> Site Address: 1960 W.11th St Dat6 <br /> 1Tia!SPAR AP��'T <br /> D. Results of Testing/Servicing <br /> Software Version installed. 329.01 <br /> Complete the foil ing checklist: <br /> N Yes ❑ No* Is the audible alarm operational? <br /> 0 Yes ❑ No* Is the visual alarm operational? <br /> Im Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> 1 Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> M Yes ❑ No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem) <br /> ❑ N/A operational? <br /> N Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) ® Sump/Trench Sensors; is Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? N Yes ❑No <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> a N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and o eratin properly? If so,at what Rercent of tank capacity does the alarm tri er? 0 % <br /> ® Yes* ❑ No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ Product;❑ Water. If yes,describe causes in Section E,below. <br /> 0 Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set-tip reports, ff applicable.2 <br /> D Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Testing was conducted for both the Diesel Conversion Permit Final and is also to be used for <br /> the Annual Monitor System Certification. <br /> Emergency Shut off switches tested and passed <br /> Drop Tubes had Flappers <br /> Replaced Diesel Annular Sensor and retested with the inspector on site <br /> Returned on 215/16 to Program the 01 to Premium and the Q3 to Diesel as they were not <br /> matching with the Tank Set Up. Notified the Inspector of the change in programming. <br />