My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
2224
>
2300 - Underground Storage Tank Program
>
PR0232555
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:22:11 PM
Creation date
6/3/2020 9:58:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0232555
PE
2361
FACILITY_ID
FA0003679
FACILITY_NAME
CALIFORNIA STOP*
STREET_NUMBER
2224
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16313007
CURRENT_STATUS
01
SITE_LOCATION
2224 MANTHEY RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232555_2224 MANTHEY_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENHANCED VAPOR RECO EKY w <br /> In March of 2000, the.California Air Resources <br /> Board adopted new, i pre stringent vapor recover ' <br /> requirements for gasoline dispensing facilities.The -" <br /> new program is titled "Enhanced Vapor Recovery, <br /> (EVR).EVR was developed to promote enhanced - <br /> vapor recovery system reliability do to seek further <br /> vapor emission reductions tomeet both Califori is <br /> and Federal Air Quality Requirements These ne <br /> compliance requirements and cerfitfi io 'rote ' f <br /> It" <br /> dures for vapor recovery equipment constltiJte the <br /> most strin;ent and comprehensive performance <br /> and reliability requirements in exi§tence for.Vapor',, <br /> Recovery Systems.Phase 1 EVIL in4force in F <br /> California Additional EVR requirements;including <br /> those for Phase 2 vapor recovery equipment,`will <br /> be phased in based,on the,timeline defined in the tt <br /> regulations (www.arbca.gov/vaporjvapor.htm):: <br /> Dut �de of California,EVR,or:certain components of <br /> EVR, is being adopted or considered in many areas,,; <br /> s� <br /> Some imoo t--mi tie.requirements-f. a certifie <br /> EVR Phase 1 System include-.' ' <br /> •EVR System Certifica,i^n Test Protocol All <br /> Phase 1 vapor recovery components must"tl��i <br /> be installed,tested d as a <br /> integral Phase 1 SO niP <br /> EVR System Efficier,,cy Must anQvu exceed <br /> .`98/over�usthe 9 /o-previously required.` ` - <br /> •EVR System Performance Allowable leak rat1�1 1,1es <br /> for components as such Spill contair dr <br /> neains <br /> valves,overfill valves;and pressure Va'd6urtt. <br /> vents have been reduced by 50%. <br /> EVR R <br /> t <br /> S sem Reliability 0 eratin testperiod <br /> y �—_Operating OPW 634TT-EVR/634LPC OPW 1711T-EVR/1711 LPC <br /> for certification of a complete system has been PRODUCT FILL VAPOR RECOVERY <br /> increased to a minimum of 180 days from the 90 DUST CAP DUST CAP u <br /> Ari <br /> day individual component test period previously € <br /> required. Periodic follow a testing of the vapor <br /> recovery systems and cothpon0�, swat gasoline . <br /> dispensing systems is <br /> R186 <br /> CAP- <br /> EVR <br /> AP � <br /> t' nolo �i standards, <br /> EVR, and its,-,t �l <br /> has raised the-b',' i Jnr petroleum equipment POPPET <br /> rnanufdcturers and.#Or,tank owners.OPW has?"';' � CENTERIh <br /> . .n <br /> esponded to this challenge by focusing our DEVICE <br /> considerable resources on the task�at�hand, ��e �> <br /> The result is the completely integrated OPA coNDuci <br /> W <br /> ROD <br /> EVR Certified Phase 1 System desi <br /> manufactured,tidkdcl and certified <br /> g nuf�acturer, nticing <br /> industry's lead d'§9 f � X t <br /> ��iPWEVR Certifred Phase 1y1 Q OPW 61 SA-EVR Q OPW 61VSA-EVR <br /> " ROTATABLE SWIVEL ROTATABLE SWIVEL <br /> ADAPTOR — FILL PORT ADAPTOR — VAPOR PORT <br /> USA Patent No.5,664,951 USA Patent No.5,664,951 <br />
The URL can be used to link to this page
Your browser does not support the video tag.