My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
2224
>
2300 - Underground Storage Tank Program
>
PR0232555
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:22:11 PM
Creation date
6/3/2020 9:58:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0232555
PE
2361
FACILITY_ID
FA0003679
FACILITY_NAME
CALIFORNIA STOP*
STREET_NUMBER
2224
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16313007
CURRENT_STATUS
01
SITE_LOCATION
2224 MANTHEY RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232555_2224 MANTHEY_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Has testing <br /> Wan nk mpul Wiring been inspected for proper entry and termination.including for ground faults? <br /> ere all tag; <br /> au&g probes visually ins�for damage and residue buildup? <br /> kj <br /> W,74-y-T,I I Fj7 W fTI W V <br /> Were all items on the equipment manuflicturer's maintenance checklist completed? <br /> 57=17w, <br /> For equipment start-up or anitual equipment certification, was a leak simulated to verify LLD <br /> (Check all that apply) Sandaled leak rate- (Y'3 &p.b-1; 0 0.1 &p.h.21- 0 0.2&p.h.2 <br /> Notes: 1. Required for equipment start-up cartification and annual certification- <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-W. <br /> NAM1 Was the testing apparatus properly calibratLSF.l <br /> For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> For electronic LLDs, e turbine automatically shut off if the LLD detects a leak? <br /> For electwmc UDs,does the t1ine automatically shut off if any portion of dw monitoring-system isttf <br /> or disconnected? <br /> For electronic LLD& does the turbine automatically shut off if any portion of the monitoring Syslerrml <br /> malfunctions or fails a test? <br /> U For electronic LLDs.have all accessible wiring connections been visualty inspeded? <br /> CRMF' 1 ■. i 1 Were all items on the equipment manufactmr's maintenance cheddist completed? <br /> 7 x I - <br />
The URL can be used to link to this page
Your browser does not support the video tag.