Laserfiche WebLink
Has testing <br /> Wan nk mpul Wiring been inspected for proper entry and termination.including for ground faults? <br /> ere all tag; <br /> au&g probes visually ins�for damage and residue buildup? <br /> kj <br /> W,74-y-T,I I Fj7 W fTI W V <br /> Were all items on the equipment manuflicturer's maintenance checklist completed? <br /> 57=17w, <br /> For equipment start-up or anitual equipment certification, was a leak simulated to verify LLD <br /> (Check all that apply) Sandaled leak rate- (Y'3 &p.b-1; 0 0.1 &p.h.21- 0 0.2&p.h.2 <br /> Notes: 1. Required for equipment start-up cartification and annual certification- <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-W. <br /> NAM1 Was the testing apparatus properly calibratLSF.l <br /> For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> For electronic LLDs, e turbine automatically shut off if the LLD detects a leak? <br /> For electwmc UDs,does the t1ine automatically shut off if any portion of dw monitoring-system isttf <br /> or disconnected? <br /> For electronic LLD& does the turbine automatically shut off if any portion of the monitoring Syslerrml <br /> malfunctions or fails a test? <br /> U For electronic LLDs.have all accessible wiring connections been visualty inspeded? <br /> CRMF' 1 ■. i 1 Were all items on the equipment manufactmr's maintenance cheddist completed? <br /> 7 x I - <br />