My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992-2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_1992-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 10:20:59 AM
Creation date
6/3/2020 9:58:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992-2000
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_1992-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />j <br />I <br />I <br />I <br />H <br />U <br />117 <br />H <br />Ll <br />0 0 <br />2)(,EAK D ECIIQN SPECIFICATIONS <br />a) The system is capable of performing precision line tests to the highest <br />value, frequency and reliability as specified by the US EPA regulations <br />and applicable Local Codes (whichever is more stringent). It also has third <br />party certification. <br />Mffc-M Me- HiMaremimmun. NN -Vol <br />13 Line Leak Testing to f= distinct values: <br />Annual Precision Test <br />Monthly Precision Test <br />Regulatory Leak Test <br />Catastrophic Line Leak <br />(e.g., 0.1 gph leak rate) <br />(e.g., 0.2 gph leak rate) <br />(e.g., 3 gph leak rate) <br />(e.g., > 10 gph leak rate) <br />13 Attempt a line test after each dispensing cycle of the pump. Dispenser <br />request aborts this test. <br />a Automatically shutdown the STP and alarm when a failed Regulatory <br />test (e.g., 3 gph) is confirmed. <br />13 Allow one manual retest of any product line which fails the Regulatory <br />Test as indicated above. Authorized service personnel will be able to <br />override this lockout function for maintenance and troubleshooting of <br />the equipment. <br />II Capability to perform leak testing at the command of the operator. This <br />function is equivalent to the line test which occurs automatically after <br />each dispensing cycle. <br />Monthly Line Test Required <br />Failed Monthly Line Test <br />Failed Regulatory Line Test <br />Catastrophic Line Leak <br />(25 days since last achieved) <br />(e.g., 0.2 gph leak rate) <br />(e.g., 3 gph leak rate) <br />(e.g., > 10 gph leak rate) <br />I Page 5 <br />D) PROBE MONITORING <br />• Interstitial Tank MQnft= <br />Probe Detects Water; Alarm, Operator <br />Probe Detects Hydrocarbon; Alarm Operator <br />•Single Wall Retrofit/Rigid Double all Tanks -and JLines: <br />STP Sump, <br />® Probe Detects Water; AI Operator <br />* Probe Detects Hydrocarbon; <br />Alarm Operator and Shutdown That Particular STP <br />I Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.