Laserfiche WebLink
4. l/ Tank cross-sectional diagram included on blueprints. 15� <br />5. ✓ Detail of tank, piping system, excavation and cover. <br />01 <br />6. ✓ Tank(s) and piping approved by a nationally recognized independent testing <br />organization. (Title 23, Subchapter 16, Article 3, Sec. 2631 (r) & 2635] <br />Verification of product compatibility with the tank(s), piping, monitoringVIK- <br />device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2 0, <br />S. ✓ Manufacturer's written installation instructions for tank(s), piping, monitoring <br />devices, etc. [Section 2635 (b) (5)J Vie <br />9. Tightness Test (NFPA 30) is required on both primary (1°) and secondary <br />(2°) containment systems before covering. (Section 2635 (b) (6) & (7)] <br />10. Double walled tanks using pressure or vacuum testing to monitor the annular <br />space. [Section 2635 (b) (7)) <br />11. NFPA 329 "Precision Test" required upon completion of installation with tank <br />in operating condition. Test results to be submitted directly to PHS/EHD <br />from the testing company or owner of facility. [Health & Safety Code, <br />Division 20, Chapter 6.7, Section 25291 (g)) <br />12. T.A1INK COMPOSITION <br />A <br />TANK # <br /># ( <br /># 2 <br /># <br /># �- <br /># <br />CAPACITY <br />i z <br />. Z, o�� <br />, z a, <br />IN ANUFACTURER <br />)('132�, <br />CO?*VIl'OSITION <br />Fjl��ffi <br />l <br />MODEL <br />GAO -11 <br />1pbcJf i 1 <br />�W'f" <br />PRODUCT <br />eocey�E <br />IJML <br />tJNUEoPer) <br />UNLEAPM <br />tJu <br />CORROSION <br />PROTECTION <br />JA,N <br />�� <br />N IAINiA <br />U.L. LISTED <br />-*z, <br />Vo A <br />COMPATIBILITY <br />WITH 1000/0 <br />METHANOL <br />` 63 <br />! <br />0 <br />