Laserfiche WebLink
SWRCB;January 2002 Page 2 <br /> 9. L/OVERFILL CONTAINMENT IWES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: F] Spill Bucket Manufacturer ❑X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: F] Pressure Vacuum rx] Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 1 REG FILL Spill Box# 2 PLU FILL Spill Box# 3 SUP FILL Spill Box# <br /> Bucket Diameter: 1211 1211 1211 <br /> Bucket Depth: 1011 1011 101, <br /> Wait time between applying <br /> pressure/vacuum/water and 1MIN 1MIN 1MIN <br /> starting test: <br /> Test Start Time: 1100 1100 1100 <br /> Initial Reading(RI ): 9" 91/411 9.511 <br /> Test End Time: 1200 1200 1200 <br /> Final Reading(RF ): 911 91/411 9.5 <br /> Test Duration: 1HR 1HR 1HR <br /> Change in Reading(R F-RI ) 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />