My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2001-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:22:36 AM
Creation date
6/3/2020 9:58:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2007
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2001-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k <br /> M oring System Certification <br /> Site Address: 1103 S. MAIN ST. Date of Testing/Service: 04/04/2006 <br /> F. In-Tank Gauging/SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes Q No. Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes Q No• Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes M No- Was accuracy of system product level readings tested? <br /> Yes MNo* Was accuracy of system water level readings tested? <br /> Yes MNo• Were all probes reinstalled properly? <br /> 1-1 Yes I ENo-j Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> Q Yes F-1 No' ❑N/A (Check all that apply)Simulated leak rate: Q 3 g.p.h Q 0.1 g.p.h ❑0.2 g.p.h <br /> [71 Yes ®No- Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> FX-1 Yes ❑No° Was the testing apparatus properly calibrated? <br /> Yes ❑No* M N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> M Yes ❑No ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ®Yes ❑No. ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> Q Yes ❑No' ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> M Yes ❑No' ❑N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Yes ❑No Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.