Laserfiche WebLink
SWRCB;January2002 Page 2 <br /> 9. SPILUOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer Industry Standard ❑ Professional Engineer <br /> Other(Specify) <br /> Test Method Used: ❑ Pressure F Vacuum ❑ Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 1 Spill Box# 2 Spill Box# 3 Spill Box# <br /> Bucket Diameter: 12 12 12 <br /> Bucket Depth: 10 10 10 <br /> Wait time between applying <br /> pressure%vacuum/water and 3 0 3 0 30 <br /> starting test: <br /> Test Start Time: 0830 0830 0830 <br /> Initial Reading(Rt ): 9 9.5 9 <br /> Test End Time: 0930 0930 0930 <br /> Final Reading(RF ): 9 9.5 9 <br /> Test Duration: 1 hr 1 hr 1 hr <br /> Change in Reading(R F-R1 ) 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> EMINIM 11 <br /> Comments- (include igforrnation on repairs made prior to testing, and recommended follow-up foi-feziled tests) <br />