Laserfiche WebLink
Page 2- of -z- <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ®Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution:0 to 15"psi <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: A,o- 5,,."A-1� <br /> Piping Diameter: 3 <br /> Length of Piping Run: <br /> Product Stored: OaL� <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressurelvacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RD: 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 2—Its— <br /> Final <br /> : (sFinal Reading(RF): PSI PSI PSI PSI <br /> Test Duration: ° Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-R): —0— PSI PSI PSI PSI <br /> Pass/Fail Threshold or Zero Zero Zero = Zero <br /> Criteria: <br /> :.F. . _ <br /> NMI. ._ . u. _: c :.... _.:. <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> '1 �S LJ -+ See C3Ft -A-Chevron -#201761 <br /> 1103 S Main Street <br /> Manteca, CA. 95337-5743 <br /> N04884R–SB989 Repairs <br />