Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 2 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed YES [ ] NO <br />2. Manufacturer's spec sheets attached for all equipment to be installed YES NO[] <br />3. Description of work to be completed (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br />use the UST Installation Application pages 4-8 as necessary for a timely plan review) <br />Iii D _ C3 iA- <br />4. Description ofa uipment to be used (Attach drawings/blueprints as necessary): <br />(NPW ,,So - Lit ® C, <br />5. All equipment is State certified or approved. YES )6 NO [ ] <br />6. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? <br />b. Identify contractor performing decontamination: <br />Name <br />Address <br />c. Describe method to be used for decontamination: <br />YES[] NO[] <br />lone <br />City <br />d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br />e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br />Hauler Name Phone( ) Hauler Reg#_ <br />Address City Zip <br />Permitted Disposal Site, <br />7. a. Describe the method that will be utilized to purge and/or inert the piping: <br />b. Piping Hauler: <br />Address <br />Hauler Registration # (if hauled as hazardous <br />c. Piping Disposal Site: <br />Address <br />EPA ID# (if transported to a permitted TSD faci <br />Zip <br />Phone ( ) <br />City Zip <br />_ Phone ( ) <br />City Zip <br />8. Is the sampling firm an independent third party from the contractor? YES [ ] NO [ ] <br />9. Describe, in detail, how the soil and/or water sample(s) beneath the piping or dispenser will be obtained: <br />f <br />Handling of excavated soil (Contaminated Soil Hazardous Waste Hauler): <br />Name Hauler Registration #_ <br />Address City <br />b) If soil is not to be hauled, describe what will be done with it: <br />2 <br />Phone ( ) <br />Zip <br />