My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:28:16 AM
Creation date
6/3/2020 9:58:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />❑ Tools & Equipment Offsets, elbows, nipples, unions, Etc.. <br />❑ Concrete Anchor Bolts* ❑ Plastic caps (sow plugs) for nuts / bolts <br />* S. Bravo Systems, Inc. does not include Concrete Anchor Bolts with its Conversion Frames. <br />❑ Ensure that you have all your permits in order, including your Bravo Certification Card. <br />❑ Conversion Frame is free of damage? <br />❑ Physically check the Dispenser, Sump and Conversion Frame drawings before installation? <br />❑ NO modification to the Conv-Frame is necessary? If so, Call 323-888-4133 immediately. <br />❑ Dispenser was carefully removed and any spills contained? <br />❑ Drawings for all components are on-site and have been reviewed for any problems? <br />❑ Conversion Frame is securely bolted to the existing UDC Sump with minimum 1/2" bolts? <br />❑ If OPP or a Non -Bravo Systems UDC is existing, were a minimum of 4 anchor bolts <br />securely installed directly to the concrete? <br />❑ All electrical conduits are adjusted correctly to mate with the new dispenser? <br />❑ All product inlets are pre -plumbed with approved offsets, elbows, pipe, etc..? <br />❑ Conversion Frame was inspected for dents or damage? <br />❑ Dispenser was carefully lined up and securely bolted to the Conversion Frame? <br />4 ii -Conversion Frame 3-25-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.