Laserfiche WebLink
11 <br />Mr. Don Mukai -32 <br />J-11TUM77110 fmTrerf C74-MOTIMT• <br />continuous monitoring system. <br />8. The CONV-B2000 shall not interfere with the capability to conduct any required <br />secondary containment testing of the UDC or the maintenance of leak detection <br />equipment. <br />9. Per CCR, § 2636(g)(3)(C), the Underground Storage Tank Program Manager <br />may modify or revoke this approval, at any time, ff there is any evidence that <br />CONV-B2000 falls to adequately protect the soil and groundwater from <br />unauthorized releases. <br />10. Each frame is only considered to be approved as long as it is manufactured, <br />installed, operated, •and maintained in accordance with Bravo's requirements and <br />the State Water Board's regulations. <br />11. The State Water Board has not reviewed the ability of the CONV-B2000 to <br />adequately anchor the dispenser to the surrounding concrete. This approval in <br />no way relieves the manufacturer or installer from responsibility,for ensuring that <br />the dispenser is properly secured in accordance with applicable codes, <br />regulations, and sound engineering practice. <br />6 . : <br />III (6m;xosis III iffol I SIZI A01010 U*24 &.,l a I it; L'&.- 18101 R <br />1111!111111111 <br />E= <br />A/ <br />Kevin L. Graves, P.E. <br />Underground Storage Tank Program Manager <br />Enclosures: 1) Drawing of Dispenser Conversion Frame, CONV-B20OU <br />2) Professional Engineers Signed Statement I <br />California Environmental Protection Agency <br />Qv Recycled Paper <br />