My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:28:16 AM
Creation date
6/3/2020 9:58:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� =1 1 7 <br />High Flow Capacity The Primary Poppet is held out of the flow stream while the secondary <br />poppet is held normally open to minimize head loss across the valve and to protect the poppet <br />seals from damage and erosion. True 11/2" (4 cm) and 2" (5 cm) body sizes ensure <br />maximum Aviv. <br />Fire Protection — A fusible link trips the valve closed at 165* F to shut off fuel supply to the <br />dispenser. <br />Main Poppet Seat Integral to the Top Assembly — Having the main poppet seat as an integral <br />part of the valve top assures a new, clean seating surface is installed each time the top is <br />replaced. This design also ensures that the integrity of the seal between the valve top and <br />bottom is verified during line testing and allows full inspection of the main poppet when the top <br />is removed. <br />• Reliable Shut-off — A stainless steel main spring, a feflon-coated brass packing nut, and a <br />copper/nickel/chrome-plated brass stem are designed to prevent tar build-up and corrosion <br />from interfering with poppet operation after is periods of normal service without activation. <br />• Integral Test Port — A S/8" (9.5 mm) Test Port allows the piping system to be air tested without <br />breaking any piping connections, <br />• Patented Thermal Relief Valve — Relieves excessive pressure build-up caused by thermal <br />expansion of fuel in the dispenser piping system in the event of fire rtprep-models <br />only), <br />Low -Profile Tops — Female and Union -top double -poppet valves have a low -profile top to allow <br />Multiple Mounting Options — Valves are boss -mounted to stabilizer bars in sumps and pans o <br />mounted to bars embedded in the island with optional U -Bolt kits I OUBK-015 (not included). <br />Versatile Combination Body (boss mount/U-Bolt mount) models are available to accommodal <br />_32mmm�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.