My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2011-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:31:21 AM
Creation date
6/3/2020 9:58:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2014
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2011-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> D.Results of Testing/Servicing JAS 2 9 2014 <br /> Software Version Installed: 330.00 ENVIRONMENTAL <br /> Complete the following checklist: HEAVTk DEPARTMENT <br /> o Yes r No* Is the audible alarm operational? <br /> 0 Yes r No* Is the visual alarm operational? <br /> * Yes r No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> * Yes r No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br /> heir proper operation? <br /> o Yes r No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> N/A <br /> *` Yes r No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring <br /> N/A stem detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check <br /> all that apply)W'Sump/Trench Sensors; WO Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection?0 Yes; r No <br /> • Yes r No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill <br /> prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If <br /> '+` N/A io,at what percent of tank capacity does the alarm trigger?% <br /> • Yes* * No Nas any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> anufacturer name and model for all replacement parts in Section E below. <br /> Yes* o Nos liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) <br /> ,1 Product• r Water.If yes,describe causes in Section E below. <br /> ra Yes No* as monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes rNo* 11s all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E.Comments: <br /> Monitoring System Certification Page 2 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.