Laserfiche WebLink
RECEIVED <br /> SWRCB,January 2002 JAN 2 9 2014 Page I of 1 <br /> 9. SPILUOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes hNVIKU ME-UAL <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested 17 <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Specify): <br /> Test Method Used By: F Pressure 17 Vacuum Hydrostatic <br /> r7 Other(Specify): <br /> Test Equipment Used:VACUUM TEST Equipment Resolution:0.1 gph <br /> Spill Brix#.Tank.TJ ?fi Box,#Tank T2Spill Box#T"T3 <br /> upce S1�R1 M1 :- RIar 2 RFfiLIi AR- Regular;t REGULAR- <br /> Fill!1-Direct, Gt l tlt l- irec t,-Grade "birect Spill Box#, <br /> level i cotttaitunent , level za containmerit 1sv1 to ct�ntatntneiti`: <br /> sump suing' suttzip <br /> Bucket Diameter: 12.00 12.00 12.00 <br /> Bucket Depth: 14.00 14.00 14.00 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min min <br /> starting test <br /> Test Start Time: 09:06:00 09:10:00 09:14:00 <br /> Initial Reading(Rt): 30.00 in.H2O 30.00 in.H2O 30.00 in.H2O <br /> Test End Time: 09:07:00 09:11:00 09:15:00 <br /> Final Reading(RF): 30.00 in.H2O 30.00 in.H2O 30.00 in.H2O <br /> Test Duration: 1 min I min 1 min <br /> Change in Reading(RF-R1): 0.00 in.H2O 0.00 in.H2O 0.00 in.H2O <br /> Pass/Fail Threshold or Criteria: +/-4.00 +/-4.00 +/-4.00 +/- <br /> Test Result: Pis$ � Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2314893 <br />