Laserfiche WebLink
0 <br /> Page 2 of 2 <br /> 2. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ® Industry Standard ❑Professional Engineer <br /> Other(Spec) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> oTestquipment Used: 4"Oil filled Gauge Equipment Resolution: 0 <br /> 87-1 Product 87—2 Product 91 Product <br /> Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 1 3' 3' 3' <br /> Length of Piping Run: 200' 200' 200' <br /> Product Stored: 87 Gas 87 Gas 91 Gas <br /> Method and location of Clamshell Clamshell Clamshell <br /> piping-run isolation: <br /> Wait time between applying 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 9:04am 9:04am 9:04am <br /> Initial Reading(Rj): 5 psi 5 psi 5 psi <br /> Test End Time: 10:04am 10:04am 10:04am <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 1 hour 1 hour 1 hour <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: ®Pass ❑Fail ® Pass ❑Fail 0 Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />