Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, Califomia 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sugov.org/ehd <br /> UNDERGROUND STORAGE TANK(UST)PROGRAM INSPECTION REPORT CONTINUED <br /> Facility Chevron USA#201761 Facility 1103 S Main Street, Manteca, CA Inspection _ \ ► <br /> Name: Address: Date: <br /> VIOLATIONS <br /> # C1 C2 M Code Section HSC=CA Health and SafetyCode;CFR=Code of Federal Regulations <br /> C1=Class 1 violation;C2=Class 2 violation;M=Minor violation <br /> Non-Pressurized Piping(continued) <br /> 702 CCR 2643(e) Biennial tightness test of gravity piping not performed(pre-January 1,1984) (M7) <br /> 703 CCR 2643(d) Triennial line test for conventional suction piping not performed(pre-January 1,1984) (M1) <br /> Other Violations <br /> 999 Other: See attached"Continuation—Official Inspection Report"for violation(s)not listed above. <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II or MINOR-Notice to Comply) <br /> Onsite to conduct a routine Underground Storage Tank (UST) inspection and observe monitoring system <br /> certification conducted today. <br /> Class II Violation: 204- <br /> 204. The designated operator failed to check and note the most current test date for the secondary <br /> containment testing on the designated operator monthly inspection report dated January 18, 2013. <br /> During the monthly inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> Ensure that designated operators performing monthly inspections at this facility are including all of the <br /> required information on the reports. CORRECTED. <br /> MINOR-Notice to Comply: 105: <br /> 105. UST Facility Operating Permit Application and UST Tank Information are not current in CERS. <br /> Any change of information must be updated in CERS within 30 days of the changes. Immediately log <br /> into CERS, update the required information, and submit for review by the EHD. Complete a separate <br /> tank form for each tank. <br /> Complete and submit a copy of the Return to Compliance Certification form with a statement of how <br /> each violation was corrected, including supporting documentation, by February 14, 2014. <br /> Provided: <br /> Return to Compliance Certification Form <br /> Note: Sensor placement brackets are installed in all STP sumps at this facility. The combination of these <br /> brackets and the sump design prevents the proper positioning of the liquid sensors, as such all three <br /> sensors are approximately 1 inch of the lowest point. Please verify that sensors are installed per the <br /> manufacturer instructions. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT END'S CURRENT HOURLY RATE. <br /> Inspector. Re i By: Title: <br /> elAQ MaWID <br /> EHD 23-02 Rev 04/19/12 PageV UST INSPECTION REPORT <br />