My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2011-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:31:21 AM
Creation date
6/3/2020 9:58:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2014
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2011-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Page 2 of 2 <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps ❑ <br /> Fill Riser Containment Sumps are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑ Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Fill Sump#87-2 Fill Sump#91 Fill Sump# Fill Sump# <br /> 7Highest <br /> ter: 48" 48" <br /> : 83" 81" <br /> Tank Top to Top of 12" 12" <br /> n Penetration: <br /> Tank Top to Lowest 24" 23"netration: <br /> Condition of sump prior to Fair Fair <br /> testing: <br /> Portion of Sump Tested Above highest Above highest Above highest Above highest <br /> penetration penetration penetration penetration <br /> Sump Material&Manufacturer: Fiberglass Fiberglass <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: 10:53am 11:18am <br /> Initial Reading(RI): 2.3161 1.9982 <br /> Test End Time: 11:08am 11:33am <br /> Final Reading(RF): 2.3161 1.9990 <br /> Test Duration: 15 min 15 in <br /> Chane in Reading(RF-RI): 0.00002 0.00083 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Is there a sensor in the sump? Z Yes ❑No ®Yes No Yes Ll No ®Yes El No <br /> Does the sensor alarm when <br /> either product or water is ❑Yes ❑No ®NA ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No ®NA <br /> detected? <br /> Was sensor removed for testing? ZYes ❑No [:INA ®Yes ❑No[:INA ZYes No ®Yes ElNo El <br /> NA NA <br /> Was sensor properly replaced and Zyes ❑No ❑NA ®Yes <br /> verified functional after testing? ❑No❑NA ®Yes ❑No DNA ®Yes [:]No❑NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.