My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2011-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:31:21 AM
Creation date
6/3/2020 9:58:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2014
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2011-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 ° <br /> The EBW AutoLimter®is a mechanical overfill device which prevents u_ hil <br /> overfilling of the tank while it is being filled. It is an automatic shut-off o Twostage spring loaded shut-off <br /> valve designed to be installed in the 4" riser pipe of underground storage flapper reduces line shock: <br /> tanks.The vertical float design reduces line shock by reducing the flow a Vertical float design allows for <br /> of product into the tank in two stages.When the tank is being filled and valve to be removed even when <br /> reaches 90% capacity the flow through the valve is limited to 10%.When tank is full. <br /> the tank reaches the 95%full level,the flow through the valve is limited a inspection test port. <br /> to 5% its normal flow. b Bottom tube threads on. <br /> • ° <br /> ULC MH21090 <br /> **Biofuel Approved(E85 and Biodiesel) <br /> *** EVR Phase 1 Certification,-11 <br /> SEAMLESS FLANGED acid-12 models VR-101 <br /> TOPTUBE <br /> (Excluding-11 and MATERIALS <br /> d `.. -12 models) Valve Body:Aluminum <br /> F Floats:Polyethylene <br /> I FACTORY SUPPLIED Upper&Lower Tube:Aluminum <br /> HEAVY WALL First Stage Flapper:Zinc <br /> ALUMINUM TUBING Second Stage Flapper:Acetal <br /> Seals to OD of valver Guide Rod:Stainless steel <br /> 2ND STAGE e • • -o • - <br /> i FLOAT <br /> o^ o • o o .a- • <br /> 1ST STAG E - ' • ° •' • <br /> jFLOAT r :b • •• o• ° ° • ° ,•- <br /> FLAPPERS • , °. • • ° • <br /> �r =� 1ST STAGE & — <br /> irli �,I 2ND STAGE <br /> THREAD ON <br /> LOWER DROP <br /> TUBE ALUMINUM <br /> (to be field cut) <br /> VALVE BODY <br /> ) <br /> 4 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.