Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING P -PAGE 2 <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METH D(S)(Check all that apply) MS0. <br /> El1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC <br /> PANEL MANUFACTURER: MODEL#: M52. <br /> LEAK SENSOR MANUFACTURER: M53. MODEL#(S): Mso. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIB Ef4WDUAL ALARMS? ❑ a.YES [Ib.NO Mss. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMPS 1 ❑ a..YES ❑ b.NO M56. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING GER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M57. <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBL ) UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: _ M58. MODEL#(S): M59. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY b.WEEKLY(Requires agency approval) M60. <br /> ❑ 4.NO DISPENSERS <br /> ❑ <br /> 99.OTHER(Specify) M61. <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70- <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS.PLAN,PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> t <br /> REFER�,NCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Mao. <br /> 1. ; THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. [OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 1/01/2005) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. ❑ OTHER(Specify): M81. <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed.. <br /> By January 1,2005 this facility will have a"Designated UST Operator"who has passed the operator exam administered by the Intemational.Code Council(ICC). By <br /> January 1,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> WWWR2 OCR <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency):yv V Mss. <br /> OPW(0t 50•w L0 C.-- &Vfk,,/4." pY RF PREY N viuvs TAt t.du <br /> VA4va WS S pr 9g aF K CA@^ <br /> AS OF 1/1105,THE"DESIGNATED UST OPERATOR"IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION- <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR 2715 b. <br /> am4 <br /> CERTIFICATION:I kertify that the information provided herein is true and accurate to the best of my knowledge. <br /> OPE I ATURE REPRESENTING DATE: M91. <br /> ga Opmer M9o. ®S-/,Ij <br /> / 7 <br /> gat1perator <br /> OWNER/OPERAT NAME(print): M92. OWNER/OPERATOR TITLE: M93. <br /> SEH Vy W S-r IDESW40A RTED o a. <br /> (Agency Use Only) This plan has been reviewed and: Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: _ Date: 5,2-1 <br /> 02 <br /> Comments/Special Conditions: <br /> SJCEHD-d(07/03)-3/4 07/23/03 <br />