Laserfiche WebLink
U, _ ED PROGRAM CONSOLIDATED FORW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page 2 of 2) <br /> . 31 TSP ISPE11 T "E 11 rI A 1�T1 l IT:(U C) +I „, RANG ; � ill <br /> DC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a. <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-54b. <br /> ...--...._..-- --._.....-......__......._._.._...__......_......_ ..... . <br /> .... <br /> ... --.. . ....._....._...-._...__................__...---......_..._ ..__ - <br /> LEAK MONITOR MANUFAC._....._....TURER: 490-55. MODEL#: 490-56. <br /> LEAK SENSOR MANUFACTURER: 1 <br /> 490-57. MODEL#(S): 490-59. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGWALE AND SUAL ALARMS. ❑ a.YES ❑ b.NO490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PWN. ❑ a.YES ❑ b.NOOso 60. <br /> FAILURE/DISCONNECTION OF UDC MONITORTRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-61. <br /> UDC MONITORING STOPS THE FLOW OF PR DISPENSER. ❑ a.YES ❑ b.NOa9a6z. <br /> ........_....._........__..._....__.... --- -- __..._-.. _---.-. ---------------.._..--�...__............ ....... ...__- <br /> UDC CONSTRUCTION IS: ❑ .SINGLE WALL ❑ 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WALL: 490-64a. <br /> UDC INTERSTITIAL SPACE IS MONI RED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECOND CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-64b. <br /> "ERIOI ;SYSTEM TESTING <br /> ❑ 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.123 CCR§z6aa.p <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br /> ICEE <br /> The following monitoring/maintenance records are kept for this facility: 490-68. <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ E ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> ... <br /> NSNG <br /> sonnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-69a. <br /> RENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490.69b. <br /> 4EMDFOPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490.69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49M9e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f. <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> El SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69g. <br /> 490-69h. <br /> ❑ OTHER(Specify): 490-69i. <br /> ® This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> : MMP <br /> ON' ' IAT ll�"•IO1�I-L <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71. <br /> 'M T'E tONNEL: .: PC NSTB LIT <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2.)all conditions that indicate a possible release are investigated;and 3.)all monitoring records are maintained properly_ - _ <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> ,/� 490-73. <br /> NAME: 0-90-72. TITLE: l"LP) (J� `'1���� �'e���s4'6ls,'�'G`� <br /> NAME: 490-74. TITLE: 490-75, <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XML.:iO N OP . TOR.SIGNATURE <br /> PCRTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> ANT SIGNATURE/'I DATE: 490-77. <br /> REPRESENTING: 1.Tank& /Operator [12. acilit Owner/O error 0 3.Authorized Representative of Owner 490-76. <br /> APPLICANT NAME(print): 490-78. 490-79. <br /> APPLICANT TITLE: <br /> j 15 5S 6 gC- &-- (26 S J " FW444-6 � <br /> UPCF UST-D(12/2007)-3/4 www.unidoes.org <br />