Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> 'RESPONSE PLAN-PAGE 1 <br /> (One form per facility) <br /> TYPE OF ACTION ❑ 1.NEW PLAN 9d2.CHANGE OF INFORMATION Rot. <br /> ACILITY ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> Fac.-r t11Li6s ,5:m ��ts r�l.� 2- J <br /> BUSINESS SITE ADDRESS 103. BUSINESS SITE CITY 104. <br /> LL C 1YT L LAN 7P MET ODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will he managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> ERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> uipment is in at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: Com Tete only i a licable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> R10. R20. R30. <br /> RI 1. R21. R31. <br /> RI2. R22, R32. <br /> R13. R23. R33. <br /> R14. R24. R34. <br /> R15. R25. R35. <br /> . ,o <br /> r S 'dTSBLE P SONS <br /> . <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME CAR401 TITLE R50. <br /> J rT Z AWKI A141A)t. 4514 SW p17 <br /> NAME p R41. TITLE R51. <br /> {F �f &,+A�t <br /> NAME R42. TITLE R52. <br /> � p, btC <br /> NAME _R_471 TITLE R53. <br /> MCAT RS= <br /> ❑ <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> 1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION 0�2. INSPECTION BY QUALIFIED PERSONS ❑3. RECALIBRATION OF EQUIPMENT Reo. <br /> 99. OTHER(Specify): /-1 �� tL'"C' +� SAA 4 V"fW Rl� � �,LL` r maw S f f w A} /�A� R61. <br /> V"Jdit- 136 4-5.C65C-d 4,1-1Q d`13 C-*,60 iM <br /> VAj5 Pi-2�MGA%"11�"0 & fa �h595' <br /> UN-022B-1/3 www.unidocs.org Rev.04/02/08 <br />