Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE 1 (One form per facility) <br /> TYPE OF ACTION ❑ 1.NEW PLAN Q 2.CHANGE OF WFORMATION Rol.. <br /> INFO <br /> FACILITY ID it (Agency Use Only) <br /> 5' <br /> BUSINESS NAME(Some as FACILITY NAME) R02. <br /> BUSINESS SITE ADDkMS CITY ROC <br /> 7 <br /> :CLE, <br /> L-"-..A- N <br /> :CO.,:NT ' ''..V 5,421e,: <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the 'a Hazardous Materials <br /> Busmm Plan. <br /> If safe to do so,fteility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safety remove <br /> remaining hazardous material from the UST system. <br /> )> Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> > Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has bocome too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and&eAjgd_eorA*=. Waste material she11 bedisposed <br /> appropriately. <br /> 0 Facility personnel will determine whether any water removed from secondary containment systems,or from clean-up activity, has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colon. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will riot be disposed to storm water systems. <br /> > We will review secondary containment systems for possible deterioration it any of the following conditions occur: <br /> I Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3 Hazardous material.other(hen the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> p. <br /> IM'VILL-CON ROLMMk <br /> : <br /> PERIODIC MAINTENANCE. Spill control and clean-up equipment kept permanently on-lite is listed in the flacility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies arc replenished as needed. Defective equipment is repaired or replaced as necessary <br /> _9%UIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED, Com late only if applicablii� <br /> EOUIPMENT LOCATION AVAILABILITY <br /> RIO, R20, <br /> R11. A11. 7 <br /> R22. R12. <br /> R13. R23. R33. <br /> R14, R24. R34. <br /> AIS. Rys. <br /> R33. <br /> NS . ........ <br /> . . . . . . PWMET so <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE ICOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME oo,;4PAO. TITLE R50., �V / 4!;A0510t_ <br /> NAME R41, TITLE <br /> NAME <br /> i42-- TITLE R52, <br /> NAME R43. TITLE <br /> ....... .. .......... <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED PVLEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> 0 Additional system testing ordata collection 0 Inspection by qualified persons ORecalibration ofequipment <br /> Other: <br /> R60. <br /> UST Response plah(3nou)-la <br /> 0 d9L80 "N WE :E 6002 U '100 <br />