My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAGMN COUNTY ENVIRONMENTAL HEALTMEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN &.2.CHANGE OF INFORIYATION 7777 Mol. <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTs AT THIS-FACILITY. MO'- ' <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency.Use Only) 77 <br /> _ l <br /> -FACILITY NAMEM03. <br /> FACILITY SITE ADDRESSl® ® M 4. CITY m 5. <br /> Z2493 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified p'rsonnel. ". <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY Mol <br /> ❑ 99.OTHER(Specify): t I; <br /> III. MONITORING LOCATIONS j <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,l cation of each sensor, ' <br /> Gine leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M10 <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARYCONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: a.DRY LIQUID FILLED ❑ d.UNDER VACUUM 11. <br /> 3 I� .b.LIQ ❑ c.UNDER PRESSURE M <br /> PANEL MANUFACTURER: �G ClQ 01 M12. MODEL#: IL U dt13. <br /> LEAK SENSOR MANUFACTURER: �� M14. MODEL#(S): ? dM15. <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: 10 6y rf16 MODEL#: /C'o b 1 MIT <br /> I IN-TANK PROBE MANUFACTURER: ,�� �1Is. MODEL:#(S): M19. <br /> i <br /> LEAK TEST FREQUENCY: []ra:CONTINUOUS ❑ b.DAILY/NIGHTLY c.WEEKLY M20 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M'-I <br /> PROGRAMMED TESTS: g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): <br /> j ❑ a.0.1 M22. M23. <br /> 93/3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. M'7. <br /> 1 <br /> &3""6.VISUAL MONITORING DONE: 0�ra.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> [] <br /> 99.OTHER(Specify): M28. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) MM <br /> M <br /> � 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMPS)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: 0a.�D,1RY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: M32 MODEL#: 60 C) M33. <br /> LEAK SENSOR MANUFACTURER: M34. MODEL#(S): M35. s <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? (-a.YES ❑ b.NO M36. <br /> �-,/ WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? [tea.YES ❑ b.NO M37. <br /> 4a 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT RO TINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICT OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTFrD/- <br /> MLLD MANUFACTURER(s): /`:�G .,/ �i �f3s. MODEL#(S): M39. <br /> G] 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40. MODEL#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42 <br /> g•P• �* <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? Ela.YES L,`a b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES [ b.NO INTEGRITY TESTING <br /> TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS _ ❑ c.OTHER(Specify) Mas. M46. S <br /> 25.VISUAL MONITORING DONE: DAILY ❑ b.WEEKLY* ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** n#47. <br /> •Requires agency approval -Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(4)(3) <br /> [f] 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ' 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> 99.OTHER(Specify) �\ Ma8. <br /> SJCEHD-d(07/03)-1/4 07/23/03 r <br />
The URL can be used to link to this page
Your browser does not support the video tag.