My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K. Float and Chain Equipment: ® Check this box if floats and chains are not present at this site. <br /> ❑ Check this box if float and chain equipment is installed but only as <br /> secondary leak detection. <br /> This section must be completed if floats and chains are used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Were all float and chain equipment properly inspected and tested for correct functionality? <br /> ❑Yes ❑ No* Were all float and chain equipment certified to be working properly? <br /> * In the Section M,below,describe how and when these deficiencies were or will be corrected. <br /> L. Impact Valves: ❑ Check this box if impact valves are not installed. <br /> Complete the following checklist: <br /> ®Yes I ❑ No* Were all impact valves properly inspected and tested for correct functionality? <br /> ®Yes I ❑ No* Were all impact valves certified to be working properly? <br /> *In the Section M,below,describe how and when these deficiencies were or will be corrected. <br /> M. Comments: <br /> Monitoring System Certification <br />
The URL can be used to link to this page
Your browser does not support the video tag.