My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 3,2010 <br /> Ms. Thuy Tran <br /> San Joaquin County Environmental Health Department <br /> 600 East Main Street <br /> Stockton,CA 95202 <br /> Re: inspection on October 7,2010 <br /> Dear Ms. Tran: <br /> In response to the corrective actions from the October 7,2010 inspection at our 10842 S Harlan Rd, <br /> French Camp facility, for every violation noted I have included a response. Please accept this letter as <br /> our return to compliance statement. Listed below is each violation followed by our response. <br /> #18 The Diesel spill container has been replaced and tested on November 5",2010. <br /> Ms.Tran was on site for this inspection.Documented statement to follow! Waiting for <br /> construction company to forward completed paperwork. <br /> #23c I have provided the missing March 2010 Designated Operator monthly inspection form. <br /> I understand that these inspection reports need to be on file for a minimum of 12 months <br /> The original was sent to French Camp and for some reason it was never placed into the <br /> compliance binder. I have provided our back-up copy to you and also have provided <br /> Frenck Camp with another copy for the binder so that we are in compliance with the 12 <br /> month requirement. <br /> #23c Designated operator will complete your requests to enter a complete date for all <br /> testing. <br /> #23c Designated operator did fail to document that all alarms were due to compliance testing. <br /> #23c As to the explanation to the Power up&Power down alarms was due to power failures <br /> in area. Explanation to the System fail(Float missing)is due to very low fuel levels in <br /> tank. <br /> P.O.BOX 401,W SACRAMENTO,CA 95691 (800)477-7266 <br />
The URL can be used to link to this page
Your browser does not support the video tag.