My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 11:43:46 AM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of TestingfServicing <br /> Software Version Installed:—123.02 <br /> Complete the foil covA g checklist: <br /> x Yes 11 No* is the audible alarm operational? <br /> x Yes 0 Ne Is the visual alarm operational? <br /> x Yes t--i W Were all sensors visually Inspected,functionally tested,arid confirmed operational? <br /> x Yes o No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfare with their <br /> prope <br /> w operation? <br /> Yes No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> x WA <br /> x Yes o No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> 0 N/A detects a leak,falls to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) <br /> 0 Sump/Trench Sensors; 11 Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> fail disconnection? a Yes; 11 No. <br /> 0 yes o No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> x WA valve is Installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating property? If so,at what percent <br /> of tank ca does the alarm trigger? % <br /> D Yes* x No Was any monitoring equipment replaced? If yes, ideriffy specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all re lacement its in Section E,below. <br /> o Yes* x No Was liquid found inside any secondary containment systems designed as dry system? (Check all that apply)0 Product. 0 Water. If <br /> M,describe causes in Section E,below. <br /> x Yes 0 Ne Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,If applicable <br /> x Yes 0 N equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.