My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 11:43:46 AM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST OPERATOR MONTHLY INSPECTION <br /> PAPERWORK HISTORY Y N N/A DATF. <br /> 9 Monitoring system certification has been completed within the past 12 months. ® ❑ p 10-31-2012 <br /> 10 Secondary containment tests have been completed within the past 36 months. ® ❑ ❑ 12.16-2011 <br /> 1 I Spill containment buckets have been tested within the past 12 months. ® ❑ ❑ 10-31-2012 <br /> 12 'Dank tightness testing was completed within the past 12 months ❑ ❑ <br /> 13 Line tightness testing was completed within the past 12 months. ❑ ❑ <br /> 14 Other required test i ng/mai mcnance was completed within the required timeframe. <br /> Test/Maintenance: ❑ ❑ ❑ <br /> ('est/Maintenance: ❑ ❑ ❑ <br /> I'est/Maintenance: ❑ ❑ ❑ <br /> FACI1ATV EMPLOYEE TRAINING Y N N/A <br /> 15 All facility employees have received the required on-the-job training within the past year. ® ❑ ❑ <br /> 16 All facility employees hired within the past 30 days have received the required on-the-job training. ❑ <br /> Note: Any answer of`•N^should be explained in the comment section on the following page,and will require follow-up action. <br /> Comments: t vvt t 1-1211ke-Cl 1G 1 c40v� <br /> J L. � .. <br /> 4,117 <br /> � l <br /> Items Requiring Follow-Up Action: <br /> ALARM PRINTOUTS <br /> .I, L <br /> g F <br /> P.O. BOX 401,W SACRAMENTO,CA 95691 (800)477-7266 <br />
The URL can be used to link to this page
Your browser does not support the video tag.